Home › Visit Foshan

Come to Foshan and choose your materials in person

Three to five days in Foshan is the most efficient way to finish a house or a hotel: you see the real products, meet the factories and leave with signed pro-forma invoices. Here is how we organise it.

Buyer inspecting production at a Foshan tile factory

How many days

  • 2 days – one category (for example tiles and bathrooms) for a house.
  • 3–4 days – a full villa package: tiles, bathrooms, windows, doors, lighting, kitchen.
  • 5–7 days – hotel, apartment building or importer programme with factory audits and mock-ups.

Before you fly

  • Send us your list two weeks ahead: drawings, room schedule, quantities, photos of styles you like, budget per category. We pre-visit factories and prepare a route so no day is wasted.
  • Visa – many nationalities now enter China visa-free for short business or tourist stays; others obtain a visa or use the 240-hour transit exemption via Guangzhou. We send an invitation letter if your consulate asks for one.
  • Payments – factories take bank transfer (T/T) to a company account; some accept Alipay/WeChat linked to a foreign card for samples. Bring a card that works abroad and a little cash.
  • Apps – install WeChat, which is how factories here communicate, and a translation app. Some international services are not reachable on local networks, so download anything you need before you travel and check roaming with your mobile provider.

Where to stay

For a tile-heavy trip, stay in Chancheng near the ceramics district (several international-standard hotels within 15 minutes of Huaxia). For mixed trips, Guangzhou’s Zhujiang New Town works too – 50–60 minutes to most markets. We pick you up at the hotel every morning.

A day with us

9:00 pick-up. We drive you to the market or factory, introduce you, translate and negotiate. You decide what you like; we write down model numbers, sizes and prices, collect samples and photograph everything. Lunch is usually at a factory canteen or a local restaurant. By 18:00 you are back at the hotel with a summary of the day’s shortlist. We repeat until the list is complete, then sit down together to finalise quantities and pro-forma invoices.

What to bring

  • Drawings with dimensions (PDF on a laptop is fine) and a room-by-room finish schedule
  • Photos or a mood board of the look you want
  • Samples of anything you need to match (an existing tile, a paint colour)
  • Your electrician’s and plumber’s requirements: voltage, drain positions, rough-in sizes
  • Comfortable shoes – showrooms are big

After the trip

We handle everything: deposits paid by you directly to factories, sample sealing, production follow-up, inspection, consolidation and shipping. Most buyers receive their container 8–12 weeks after the visit.

Fees for the visit

5–10% buying commissionCar, driver and interpreter included

One commission covers the whole job: the factory and market visits, finding and checking suppliers, negotiation, specifications written in Chinese, sample sealing, order organisation, the export paperwork, production follow-up, pre-shipment inspection, container consolidation, and after-sales follow-up with the manufacturer. Full service details →

Book your dates

Tell us when you can come and what you need. We confirm availability the same day.

Coming to Foshan?

Send your dates and material list. We plan the route, book the factories and meet you at the hotel.

WhatsApp